Henry County, Indiana
Land clearing in New Castle, Indiana
New Castle is a short run west of Richmond on I-70. Land clearing, forestry mulching, brush hogging and excavating, priced by the day with the rate breakdown shown before you sign.
What the ground is like here
Henry County is flat glaciated till plain — big open farm ground with the Big Blue River and its feeder creeks cutting shallow wooded draws through it. Most of the work here is fence rows, ditch banks and woodlots that have grown shut. Open, flat ground is fast ground, and the quote reflects that.
How we price a New Castle job
- Priced by the day, $2,500–$6,500 depending on brush density, grade, ground and access.
- Acreage sets the number of days. One-day minimum on every job.
- You see the rate breakdown before anything is signed.
- Contract signed electronically in advance — never in your driveway.
What we get called for around New Castle
Fence row and ditch bank clearing
Woodlots grown shut with brush
Brush hogging fields back into use
Site prep and pad clearing
Services
What we run in New Castle

Land Clearing
Open up lots, pastures, and building sites.View service
Forestry Mulching
Dense brush, saplings, and invasive growth mulched in place.View service
Tree Service
Removals, trimming, and storm cleanup.View service
Excavating
Grading, ponds, drainage, and site prep.View service
Brush Hogging
Fields and overgrown open areas knocked back fast.View service
Fence Line Clearing
Open property edges for fencing, access, and visibility.View service
Snow Removal
Commercial plowing, ice control, and seasonal contracts.View serviceSchedule it
Book a day in New Castle
Pick the work and a day that suits you. A 50% hold books the day and is credited straight to the job — the balance is billed after the work is finished, not before.
- Contract written and signed electronically in advance.
- Nothing goes on the calendar until the contract and hold are cleared.
- Balance due on completion. No cash.
Nearby areas we cover
Before we arrive
Metal, wire, fencing, private utilities, and septic components have to be removed or marked before the crew rolls in. Our site-prep checklist walks through every item. If the site can't be worked safely on arrival we bill a mobilization minimum of half your daily rate (minimum $1,000) and put $500 back toward the job when you reschedule within 60 days.
Day rates run in three tiers — $2,500 standard, $4,500 difficult, $6,500 severe — set by brush density, terrain, ground conditions, and access. One-day minimum. Run your numbers.
